Commercial Strategy

Commerical plan

UK wave and tidal marine energy resource -here

Developmental potential of our technology

Bristol channel development strategy

  • Development of the Bristol channel site will be in phases.
  • Phase 1, construction an installation of 1MW protype turbine.
  • Phase 2, 3 additional turbines grid connected to Aberthaw, cashflow positive.
  • Phase 4 onwards with potential for 1,500 turbines, 4-6 lines.

Engineering Schematic of Lynmouth Turbine General Assembly

Bristol Channel Array

Appledore Shipyard

Swansea Docks