Development Potential of Pliosaur Energy Technology

Lynmouth Bay Site Location

Development of the Lynmouth site will take place in a series of Phases.
- Phase 2, construction of 1MW protype turbine installed offshore in the Lynmouth lease area.
- Phase 3, construction of 2-3 additional turbines grid connected to shore. (Minimisation of finacial risk to reach cashflow positive).
- Phase 4, construction of 7 additional turbines to reach capacity of Lynmouth local grid connection.
- Phase 5 onwards, phased development of the very large array, with potential to reach 1,500 turbines installed in several lines well away from the navigation channel.


Engineering Schematic of Lynmouth Turbine General Assembly

Bristol Channel Array

Appledore Shipyard, Bideford North Devon

Appledore Shipyard Drydock Facilities