Commercial Strategy
Commerical plan
UK wave and tidal marine energy resource -here
Developmental potential of our technology
Bristol channel development strategy
- Development of the Bristol channel site will be in phases.
- Phase 1, construction an installation of 1MW protype turbine.
- Phase 2, 3 additional turbines grid connected to Aberthaw, cashflow positive.
- Phase 4 onwards with potential for 1,500 turbines, 4-6 lines.