Commercial Strategy
Commerical plan
UK wave and tidal marine energy resource
Learn more in the detailed resource assessment provided by The Crown Estate: Download the full report here .
Developmental potential of our technology
Bristol channel development strategy
- Development of the Bristol channel site will be in phases.
- Phase 1, construction an installation of 1MW protype turbine.
- Phase 2, 3 additional turbines grid connected to Aberthaw, cashflow positive.
- Phase 4 onwards with potential for 1,500 turbines, 4-6 lines.
Engineering Schematic of Lynmouth Turbine General Assembly
Bristol Channel Array
Appledore Shipyard
Swansea Docks